Skip to content
Compare TV
Train Rescue Down Under poster

Train Rescue Down Under

Train Rescue Down Under

20 May 2025Rated PG10 episodes

Where to watch Train Rescue Down Under Season 1

Train Rescue Down Under season 1 is free to watch in Australia on 7plus. Season 1 was released on 20 May 2025.

We may earn a commission when you sign up through our links. How we make money.

Free

Availability checked 16 November 2026.

Train Rescue Down Under Season 1 air dates

Premiered
Final episode aired

Air dates: TMDB.

Train Rescue Down Under Season 1 episodes

  1. S01 E01

    All Aboard An Australian Icon

    45m

    The iconic Ghan needs some bogies changed fast, a routine wheel lathe job hits a snag, plus an 80 year old steam loco climbs a mountain for a special anniversary.

  2. S01 E02

    Getting a Freight Train to the Finish Line

    45m

    The Spirit of Queensland’s maintenance team race to change a bogie, the construction of a freight locomotive nears completion, and a breakdown crew hustles to get a commuter train back on track.

  3. S01 E03

    High Stakes Engine Rebuild

    45m

    Skilled technicians battle with a stubborn alternator, a crew tackle a high-stakes engine rebuild for a freight train, plus it takes a team of experts to build a massive locomotive underframe.

  4. S01 E04

    Getting A Cane Loco Back To Harvest

    45m

    A loco needs a double bogie change to get back to the sugarcane harvest, traction motors from mining trains are getting rebuilds, plus the heat is on for a tricky air conditioner replacement.

  5. S01 E05

    One Day Mission To Replace Freight Engine

    45m

    A freight train needs an urgent engine replacement after a critical failure, a 132 T loco requires a complex bogie change, plus catch the special forces of rail, the RORU team, in action.

  6. S01 E06

    Single Day Traction Motor Challenge

    45m

    A commuter train undergoes a tough traction motor replacement, one maintenance team takes on two huge jobs, plus a leaky torque seal sidelines a sugarcane loco urgently needed for the harvest.

  7. S01 E07

    High Precision Gear Box Overhaul

    45m

    A finicky one tonne gearbox, a tight squeeze into a vintage loco during a boiler service, plus shunting a train across 3 rail crossings at peak hour - just another busy day in railway maintenance

  8. S01 E08

    Rusty Water Tank Cut Off Steam Loco

    45m

    A rusty 10 tonne water tank gets cut off a vintage steam loco, a challenging 4-car passenger train lift & bogie change, plus Kuranda Scenic Railway carriages get spruced up by the carpentry team.

  9. S01 E09

    Loco Maintenance Team Expect The Unexpected

    45m

    A busy loco maintenance team that always expect the unexpected, a challenging 8 tonne water tank installation on a vintage loco, plus an electronics team on a mission to stop e-waste in its tracks.

  10. S01 E10

    The Heat is on to Crane in a Rooftop

    45m

    Maintenance teams pool their brain power to test pantographs, fix a leaking air conditioner, remove debris from high voltage train power lines.

Episode names, air dates, runtimes and summaries: TMDB. Air dates are the first broadcast anywhere.